
CASE STUDY · GREENWICH, CT
Greenwich Catholic School: Full Sand and Refinish of the Gym Floor
Since 2001 · 50,000+ projects
Call or text 24/7: 973-801-7219
In 2020 J & J Gym Floors fully sanded and refinished the gym floor at Greenwich Catholic School in Greenwich, Connecticut, then painted all new game lines and the school crest at center court. The worn, orange-toned floor came back bright.
| Customer | Greenwich Catholic School (Diocese of Bridgeport) |
|---|---|
| Location | Greenwich (Fairfield County), CT |
| Year | 2020 |
| Project | Full sand and refinish of the gym floor; all new game lines and the center-court crest painted by J & J |
| Also included | Repairs in four corners of the gym, new cove base, and the stage floor painted black |
| Finished look | Bright, freshly sanded wood with all new game lines and the school crest at center court |
Before and after


The project
Before the job, the gym floor had a worn, orange-toned finish, a green center circle and old game lines. A full sand takes the floor down past the old finish, paint and lines to fresh wood, so the floor can be refinished from scratch instead of just recoated.
After sanding the floor down to fresh wood, we painted all new game lines and the school crest at center court, then refinished the floor. The school chose a cleaner logo layout, without lettering above and below the center logo.
The same job also covered:
- Repairs in four corners of the gym floor
- New cove base around the floor
- Painting the stage floor black
Doing all of it in one booking meant one schedule and one team for the school.
When a floor needs a full sand
A yearly screen and recoat keeps a healthy finish in good shape, but it can’t fix a finish that has worn through or a floor that has darkened and yellowed over the years. When the color, lines and logos need to change, or the finish is too far gone, a full sand and refinish starts the floor over.
Related services: sanding and refinishing, screening and recoating, game lines and logos.
More case studies
- The Pingry School: both gym floors replaced with new maple (2019)
- Immaculata High School: full sand, refinish and yearly recoats
- Bangor Area School District: new maple high school gym floor and wall pads
Planning a project like this?
Call or text 973-801-7219 any time, 24/7, or request a quote. J & J Gym Floors has worked on gym floors since 2001 and has completed more than 50,000 projects.

